Reviews

10/10

The original bathroom (tub, single vanity, shower stall squeezed into a corner so the bathroom door couldn't open properly) was completely gutted, the bulkhead removed (suggested by Paul and great idea!), and one wall was removed to be rebuilt slightly forward to allow for plumbing that couldn't be run through a firewall (townhouse complex). The tear-down took about 3 hours. The following work was done to create an amazing bathroom:-bathtub installed-plumbing created so there could be a shower in as part of the tub area-new ceiling put above tub-pot lights installed above the tub and across the ceiling-all boarding done around the tub for moisture-proofing the area-tub area tiled up to the ceiling with tile border in complimentary colour-niche installed and tiled in complimentary colour-exhaust fan changed to an incredibly quiet and attractive model-wiring of the original light was changed to accommodate two lights above each mirror-installation of 60" vanity with mirrors above each of two sinks-ceramic tile floor-painting of walls and door-crown moulding-plumbing created for two sinks-installation of new toilet-wiring of exhaust fan connected to a timer; pot light above the tub is on an independent switch, as are the other pot lights and the lights above the vanity (great electricity saver)Whenever decisions had to be made, Daniel or Paul was very patient and gave us the information that helped us make those decisions. Communication was excellent throughout the project. Cleaning up each day was perfect, as was the clean-up at the end of the project.

Approximate cost of services:
$20,000.00
Was this review helpful?
Company Response

It has been a pleasure working with you Terri. I hope we can do another project soon.
Hawkeye's Renovations
With an Eye for Detail!
https://www.hawkeyesrenovations.com/
905-464-3977