1/ Oct' 23 Redo interlocking deck and front entrance steps
2/June '24 :redo interlocking around driveway, walkway and side of house
3/Painted exterior of house, foundation repair and parging, altered the grade of side of house for better drainage, emptied and painted garage, flanged garage door entry, Epoxy garage floor. Laid 60 feet of pressured treated garden border, replaced garden fence.
4/ July '24. Total emergency emptying and stripping of basement room and mold remiteration. treatment of walls and flooring and replacing of flooring with painting of walls. disposal of room contents.
5/Nov'24 complete redo of 3 bathrooms ..5 weeks
5/Nov '24 Complete renovation of 2 existing bathrooms and update of powderoom. . All in 5 weeks.
6/ Jan '25 Painting of 4 bedroom walls and ceilings. Ceiling of livingroom.