Contractor not showing up
ANITA PATEL 24/11/2026 - 10:15 AM
At what point should I fire my contractor?
Are you a pro and able to answer this question?
2 Answers
Manni Kang
Rating: 5 out of 5
Honestly, if he's missed two dates in a row and isn't picking up the phone, that's your answer right there. A good contractor tells you when something's delayed before you have to chase him. I'd give him one clear message — what needs to happen by when — and if nothing changes after that, let him go. Before you do, check what you've paid versus what's actually done, and get everything in writing so you know where you stand. Don't keep paying ahead hoping he'll show up.
Answered24 November 2026
0
Homewrap Construction ltd.
Rating: 5 out of 5
Addressing the dismissal of a contractor within a contractual agreement is a critical matter that must be carried out strictly in accordance with the terms of the contract exchanged between the two parties. This is precisely where having a written contract between the owner and the contractor takes on particular significance. Provided that the owner has committed no default in their own contractual obligations and has fulfilled all duties in accordance with the contract terms, the grounds that may lead to the dismissal (termination) of a contractor under a contract are summarized as follows:
Bullet Unjustified Delay in Performance: The contractor falling behind the agreed schedule without valid justification, or delays exceeding the maximum threshold permitted under the contract.
Bullet Failure to Meet Quality and Technical Specifications: Performing work that deviates from agreed plans, standards, or quality requirements, and refusing to rectify such defects after receiving written notice.
Bullet Abandonment or Unauthorized Work Stoppage: Shutting down the site, abandoning the project, or halting operations without the owner’s authorization and coordination.
Bullet Failure to Comply with Contractual Notices: Ignoring the owner’s written warnings and notices and failing to cure defects within the timeframe stipulated in the contract.
Upon the occurrence of any of the above events, the owner may, subject to observing the procedures and notice requirements set forth in the contract, proceed with terminating the engagement, and completing final settlement based on the actual work properly performed to date.
Answered24 November 2026