HomeOwner
Bathroom renovations after roof leak
Answer from pro:
Thanks for the feedback Let me know if I can help again
Reply created 13 Nov 2019Vail Renovations And Handyman Services
Thanks for the feedback Let me know if I can help again
Reply created 13 Nov 2019Glad I could help. Let me know if I can help in the future
Reply created 13 Nov 2019Thanks Alexander for your great feedback. Glad I was able to make this a reality for you. Let me know if I can help again. Take care
Reply created 8 Nov 2019Glad to help. Love the pattern. Let me know if I can help next time. Take care
Reply created 1 Nov 2019Thank you for the great feedback and repeat business. I always do strive for perfection and it's great to hear. Let me know if I can help again
Reply created 27 Aug 2019Thanks for the kind words. Glad it all went according to plan. Let me know when we can help again Looking forward to the kitchen
Reply created 8 Aug 2019Very disappointed in this review the original quote and job was to remove an existing bathroom on the 17th floor and assemble new. The additional cost was 500.00 in materials not including labor to install a sound proofing membrane as required by the condo corporation which was not know at the time of the site visit This issue was conveyed to the client and the extra funds were paid right away The plans for this bathroom changed by the day quite literally and when the promise of more work was given much more work was turned away With the large amount of indecisiveness in the bathroom more charges for almost 3 weeks of sporadic down time could have been charged and wasn't In order to stay on whatever timeline was left and not have to wait for the plumber to arrive in a couple days and relieve the stress of the whole renovation process on her elderly father I suggested taking a look at the toilet and if simple enough I would install it myself saving both time and money for her elderly father already stressed and once the box was opened it was discovered not to be a conventional toilet and it was decided to rely on the plumber after all As for the kitchen the countertops were chosen at Lowe's and when they mentioned the almost 2 month delay with Lowe's I offered my granite connections to help speed up the timeline and gave them the contact info along with a price upfront which matched Lowe's but could get it installed in approximately 10 working days This price was given by the granite company to the client and the client payed the granite company directly with no money changing hands through Vail renovations. Another delay was a discrepancy in price because when the final measurements were taken the edging was changed adding 2000.00 to the price and then changed back We do not accept commission or kick backs of any kind whatsoever and never have. All our costs are charged 100% to the client with no markup and even mentioning or accusing us of that is unfair Every job they wanted done was quoted and then changed multiple multiple times and when asked to quote was made to feel like a crook each time Lowe's or someone else came in to give a quote even though we were onsite The 500.00 for the second bathroom was to (supply and install) sound proofing and new tile in the vanity location so once again when that work was complete and they actually decided to move forward with the balance of the floor it would tie in properly and be at the proper height as there was only concrete slab under the existing and to add soundproofing and tile after the fact to the balance of the room changes the vanity elevation to a non-ergonomic height The two small scratches to the drawer were mentioned and a new drawer Face was ordered and we were to be called upon its arrival by the client to change it and that never happened Vail renovations works on pride of workmanship and 100% transparency and always when given discounts those discounts get applied to the clients final cost and not pocketed At the end of the day this client is very fortunate that we were so understanding and patient with the large scale indecisiveness and constant battle between family members changing plans hourly quite literally causing huge amounts of unrecoverable down time that wasn't charged back and maybe should have been as for the one girl removing wall paper patching and painting we did give a price and if a client can find cheaper than great and good for them but there's a difference between a fully insured company and a 20.00 an hour girl and also no timeframe was given for the work just a price which originally they requested we add another layer of drywall over the existing wallpaper and start from scratch and it was US who convinced the client that that was unnecessary and it could be simply removed. Which for all intensive purposes price comparisons on work that was never done shouldn't be included in this review and any defects weren't even brought to our attention and given the opportunity to address or fix The work was complete and paid in full with no mention of any defects or issues making this review extremely unfair and is more about work we didn't do than the work performed
Reply created 10 Jul 2019Tha k you Lori for your input and great review. Please let me know when and if you. We'd help in the future
Reply created 11 Apr 2019Thank you very much sir for the kind words. Glad it all came together. Same view at the end of the day. If you need help in the future don't hesitate to contact me
Reply created 10 Apr 2019Tha is for the great review and kind words. Let me know when you need help again. Enjoy the basement
Reply created 18 Mar 2019