Find Demolition company leads in your area

View local trade work

By clicking the 'Agree & Sign up for free' button you indicate that you have read and agree to the Professional User Agreement.

This agreement contains limitations on your legal rights and remedies and our liability and mandatory arbitration. Please read carefully.

For information on how we process your data, see our Privacy Policy.

How to find the work you want

STEP 1

Receive tailored leads

Set up your free professional profile and we’ll send you leads that match your skills and service area.

STEP 2

Show interest

Respond to as many leads as you like. Based on your profile, work history and reviews, homeowners decide who to share their details with.

STEP 3

Connect and arrange

If you're shortlisted, we charge you a fee for the customer's contact details so you can get in touch to exchange more details about the job.

Download our app

Finding and arranging jobs is even easier with the HomeStars app. Download it now to search for jobs, receive instant notifications for leads and shortlists and chat with prospects and customers - wherever you are.

These leads might interest you

Demolition work: Complete building, House; 1000 sq ft

Demolishing whole house

Demolition work: Partial - Indoors; 100 sq ft

Job scope: Protect the work area before starting Move furniture out of the work area Remove basement ceiling drywall Remove crown molding Bag and remove all demolition debris Clean up the work area after completion In Richmond, start and finish tomorrow.

Clear out or disposal household content: 2 rooms; Furniture

1. Dispose of couch from basement 2. Move another couch from the main floor/ aka: 1st floor down to basement

Create openings and coring walls: Exterior walls; 1 opening

Hole to be 1.25 inches so i can put a 3/4 inch pvc flex pipe through it to pull wire. The inside area where the hole will go is unfinished so no replastering etc needed. I also need to mount brackets to install 3/4 inch flex pipe along the wall, it would be 6 brackets each would have two screw holes(one per side). To install two screws for a pressure wash hose bracket to mount on same type of wall. And last to install (no electrical just physical mounting as we will get an electrican to do the actual box an electrical pannel box on wall.

Demolition work: Strip out complete interior; 1500 sq ft

● Complete non-structural interior demolition of the home down framing (1,110 sqft. above grade and 464 sqft. basement). ● Hazardous-material abatement and disposal in accordance with the Designated Substance Survey provided. ● Remove existing kitchen cabinets, countertops, appliances, bathroom fixtures, lighting fixtures and all other fixtures and items not identified for reuse. ● Remove plaster, lath, drywall, ceilings, trim, baseboards, interior doors and other interior finishes. ● Remove all interior wall insulation. Remove attic insulation using dust-control and vacuum-removal methods prior to second-floor ceiling demolition. ● Remove duct wrap throughout while taking precautionary steps as noted in the DSS. Noted on duct verticals. If necessary, remove the portion of the duct-chase with duct-wrap. ● Remove flooring while retaining structural subfloors and floor framing. Flooring removal should be carried out in steps; where the laminate/vinyl layers will be first removed to investigate existing hardwood underneath, if salvageable. ● Remove basement wall panels, ceiling finishes, flooring and water damaged materials. ● Remove all existing knob-and-tube wiring, abandoned wiring and electrical fixtures. ● Remove non-structural interior partition walls identified for removal. Only walls specified for removal with confirmation by the Owner. ● Rear mudroom addition (~35sqft) complete structural demolition, to be cut off from the house exterior wall. Completed last, after confirmation received by the Owner. ● Remove all protruding nails, screws, staples from framing and subfloors. ● Retain and protect the furnace, A/C, water heater, plumbing, ductwork and other mechanical systems unless specifically identified for removal. ● Ensure existing ducts / vents are sealed prior to commencing work. ● Retain and protect all structural framing, exterior walls, foundations, masonry, stairs, roof, windows and exterior doors. ● Provide dust control, temporary protection, site supervision, garbage bins and all required waste disposal. ● Remove all demolition debris from the property. Leave interior surfaces within the house and basement clean and thoroughly vacuumed, and leave exterior areas broom-clean. ● Report any rot, water damage, structural concerns or unexpected site-conditions before proceeding with work. ● Before commencing work, Owner or Contractor will arrange licensed trades to disconnect electrical, plumbing and gas utilities.